Prime Resins News

Stabilizing the historic Cleveland West Pierhead Lighthouse

When deterioration was threatening the structural stability of a nearly 100 year old lighthouse, stabilization grouting was performed with Prime Flex 985 LX-10.

Cleveland Lighthouse

When deterioration was threatening the structural stability of a nearly 100 year old lighthouse in 2009, stabilization grouting was performed with Prime Flex 985 LX-10. Learn how Geotechniques, Inc (Buffalo, NY) was able to address all concerns. Read the full case study here.


news button prev
news button next