Prime Resins News

Underpinning at Nellis AFB

A three-story office building at Nellis AFB was renovated and converted to living quarters. One challenge posed in the project was underpinning the existing foundation for the 8-foot depth excavation required for the construction of an elevator shaft adjacent to the foundation. Structural drawings were provided for the underpinning of the foundation, but the contractor was required to construct a shoring plan for the vertically cut subgrade soils.

View this case study here.


news button prev
news button next